Presetting
Payback Calculator
This evaluation is based on off-line measurement and
pre-qualification of the tool assemblies. Hidden cost savings not included are reduction in scrap rates, increase in tool life and overall improved inspection of the cutting tools.
Results
Current Cost/Year
CC = $
R * T * (TM / 60) * N * S * MU
Savings Per Year
SY = $
CC – PC
Proposed Cost
PC = $
T * N * S * (TP/60) * LR * MU
Payback Period
PP / (SY/12)








